The Canje Bridge
replaced an old swing bridge structured of iron and concrete by Joseph
Westwood,an English Civil Engineer in 1891.This antiquated mechanism was an
historical landmark for more than 85 years.It was swung out to allow the tall
masts of sugar-laden vessels to go through,then the two portions were swung
back in to allow the flow of vehicular traffic again.The current bridge which
became operational in February 1978 is 1,732 feet long,33 feet wide and 45 feet
high crossover which took 18 months to complete. (Extracted from Dave’s Television Channel 8 (DTV-8)
Canje Bridge |
Comments
Post a Comment